﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0"><channel><title>Rebuild Christchurch Feed</title><link>http://www.rebuildchristchurch.co.nz/</link><description>The latest from the Rebuild Christchurch Blog.</description><docs>http://www.rssboard.org/rss-specification</docs><generator>Rebuild Christchurch Website</generator><item><title>Cabinet Paper and Minute of Decisions on the report and recommendations of the Canterbury Earthquakes Royal Commission</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2013/4/avonside-chch-cabinet-paper-and-minute-of-decisions-on-the-report-and-recommendations-of-the-canterbury-earthquakes-royal-commission'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2013/4/avonside-chch-cabinet-paper-and-minute-of-decisions-on-the-report-and-recommendations-of-the-canterbury-earthquakes-royal-commission</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Mon, 15 Apr 2013 21:20:00 GMT</pubDate></item><item><title>Public consultations on quake-prone buildings begin</title><description>Public consultation meetings will be held across New Zealand this month as the Government looks to make changes to its system for dealing with earthquake-prone buildings.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2013/2/the-nz-herald-public-consultations-on-quake-prone-buildings-begin'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2013/2/the-nz-herald-public-consultations-on-quake-prone-buildings-begin</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Mon, 04 Feb 2013 20:41:55 GMT</pubDate></item><item><title>NZ Army to explain civil defence failure</title><description>Media Release: Rik Tindall, ECan In Exile&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2013/1/nz-army-to-explain-civil-defence-failure'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2013/1/nz-army-to-explain-civil-defence-failure</link><author>website@rebuildchristchurch.co.nz (PRNews)</author><pubDate>Sat, 26 Jan 2013 17:49:31 GMT</pubDate></item><item><title>CBD building owner: Alan Reay criticism ‘unfair’</title><description>The owner of a Christchurch office block, designed by the same man behind the ill-fated CTV building, says the engineer has been unfairly targeted.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-cbd-building-owner-alan-reay-criticism-unfair-'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-cbd-building-owner-alan-reay-criticism-unfair-</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 12 Dec 2012 12:40:00 GMT</pubDate></item><item><title>Council may be unaware of buildings similar to CTV</title><description>The Christchurch firm that designed the ill-fated CTV office block which collapsed in the February 22 earthquake, killing 115 people, may have built similar buildings that the council does not know about and have since gone unchecked&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-council-may-be-unaware-of-buildings-similar-to-ctv'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-council-may-be-unaware-of-buildings-similar-to-ctv</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Tue, 11 Dec 2012 20:16:33 GMT</pubDate></item><item><title>Council will cooperate with any police investigation over CTV</title><description>The Christchurch City Council has apologised to those affected by the CTV building collapse and promised to cooperate with any police investigation.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-council-will-cooperate-with-any-police-investigation-over-ctv'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-council-will-cooperate-with-any-police-investigation-over-ctv</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Tue, 11 Dec 2012 17:31:00 GMT</pubDate></item><item><title>CTV building errors laid bare in report</title><description>A series of engineering, construction and council-related errors over 20 years led to the catastrophic collapse of the CTV building in the second major Christchurch earthquake, a Royal Commission has found.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-ctv-building-errors-laid-bare-in-report'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-ctv-building-errors-laid-bare-in-report</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Mon, 10 Dec 2012 16:00:00 GMT</pubDate></item><item><title>Govt to carefully consider Royal Commission report</title><description>Christopher Finlayson | Attorney-General&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-govt-to-carefully-consider-royal-commission-report'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-govt-to-carefully-consider-royal-commission-report</link><author>website@rebuildchristchurch.co.nz (GovtBeehive)</author><pubDate>Mon, 10 Dec 2012 15:08:00 GMT</pubDate></item><item><title>PM welcomes Royal Commission report release</title><description>John Key | Canterbury Earthquake Recovery&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-pm-welcomes-royal-commission-report-release'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-pm-welcomes-royal-commission-report-release</link><author>website@rebuildchristchurch.co.nz (GovtBeehive)</author><pubDate>Mon, 10 Dec 2012 15:05:00 GMT</pubDate></item><item><title>Families welcome CTV findings</title><description>Families of Canterbury Television building collapse victims have welcomed the findings of a royal commission into the building&amp;#39;s collapse.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-families-welcome-ctv-findings'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-families-welcome-ctv-findings</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Mon, 10 Dec 2012 10:29:54 GMT</pubDate></item><item><title>Report into CTV building collapse due</title><description>The Canterbury Earthquakes Royal Commission&amp;#39;s view of the CTV building collapse is going to be made public.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-report-into-ctv-building-collapse-due'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-report-into-ctv-building-collapse-due</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 10 Dec 2012 05:24:00 GMT</pubDate></item><item><title>Govt should release CTV report this week</title><description>The Government must urgently release part three of the Canterbury Earthquakes Royal Commission Report which includes a section on the collapse of the CTV building, says Labour&amp;rsquo;s Earthquake Recovery spokesperson and MP for Christchurch East, Lianne Dalziel.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/govt-should-release-ctv-report-this-week'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/govt-should-release-ctv-report-this-week</link><author>LianneDalziel.MP@parliament.govt.nz (LianneDalziel)</author><pubDate>Sun, 09 Dec 2012 20:11:05 GMT</pubDate></item><item><title>Canterbury Earthquakes Royal Commission Reports</title><description>Gerry Brownlee | Canterbury Earthquake Recovery&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-canterbury-earthquakes-royal-commission-reports'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-canterbury-earthquakes-royal-commission-reports</link><author>website@rebuildchristchurch.co.nz (GovtBeehive)</author><pubDate>Fri, 07 Dec 2012 12:03:00 GMT</pubDate></item><item><title>Earthquakes Royal Commission Vol 4 released</title><description>Christopher Finlayson | Attorney-General&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-earthquakes-royal-commission-vol-4-released'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/beehive-earthquakes-royal-commission-vol-4-released</link><author>website@rebuildchristchurch.co.nz (GovtBeehive)</author><pubDate>Fri, 07 Dec 2012 11:38:00 GMT</pubDate></item><item><title>Thousands of quake-prone buildings identified by Govt</title><description>The Government estimates there are as many as 25,000 earthquake-prone buildings around New Zealand.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-thousands-of-quake-prone-buildings-identified-by-govt'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-thousands-of-quake-prone-buildings-identified-by-govt</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Fri, 07 Dec 2012 10:45:00 GMT</pubDate></item><item><title>Most NZ buildings to be quake assessed</title><description>Every building in New Zealand, except single-storey homes, will be assessed for earthquake risk and the results made public under Government proposals released this morning.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-most-nz-buildings-to-be-quake-assessed'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-most-nz-buildings-to-be-quake-assessed</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Fri, 07 Dec 2012 10:35:24 GMT</pubDate></item><item><title>CTV inquiry wraps in Christchurch</title><description>The coronial inquiry into the collapse of Christchurch&amp;rsquo;s CTV building has wrapped up this afternoon.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-ctv-inquiry-wraps-in-christchurch'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-ctv-inquiry-wraps-in-christchurch</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Thu, 06 Dec 2012 12:06:00 GMT</pubDate></item><item><title>'This is what you train for all your life'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-press-news-this-is-what-you-train-for-all-your-life'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-press-news-this-is-what-you-train-for-all-your-life</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Thu, 06 Dec 2012 00:56:00 GMT</pubDate></item><item><title>'Improvements will be made' - fire official</title><description>A Fire Service official has promised the widow of a CTV victim that major changes will be made to rescue efforts in the future.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-improvements-will-be-made-fire-official'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-improvements-will-be-made-fire-official</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 05 Dec 2012 17:34:00 GMT</pubDate></item><item><title>CTV inquest: High-tech equipment failed</title><description>High-tech cameras designed to probe collapsed buildings and search for signs of life failed on February 22 and have since been replaced, an inquest was told today.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-ctv-inquest-high-tech-equipment-failed'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-nz-herald-ctv-inquest-high-tech-equipment-failed</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Tue, 04 Dec 2012 19:36:34 GMT</pubDate></item><item><title>CTV collapse: Widower asks for answers</title><description>The widower of a woman who died in the Canterbury Television (CTV) building says he just wants answers, not fingers pointed.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/the-press-news-ctv-collapse-widower-asks-for-answers'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/the-press-news-ctv-collapse-widower-asks-for-answers</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 03 Dec 2012 20:06:00 GMT</pubDate></item><item><title>Inquest into CTV earthquake deaths resumes</title><description>A coroner&amp;#39;s inquest into deaths at the CTV building is resuming on Monday with footage available online.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-inquest-into-ctv-earthquake-deaths-resumes'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/12/3news-co-nz-inquest-into-ctv-earthquake-deaths-resumes</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 03 Dec 2012 05:19:00 GMT</pubDate></item><item><title>Government receives final part of Canterbury earthquakes report from Royal Commission</title><description>Christopher Finlayson | Attorney-General&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/beehive-government-receives-final-part-of-canterbury-earthquakes-report-from-royal-commission'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/beehive-government-receives-final-part-of-canterbury-earthquakes-report-from-royal-commission</link><author>website@rebuildchristchurch.co.nz (GovtBeehive)</author><pubDate>Thu, 29 Nov 2012 12:00:00 GMT</pubDate></item><item><title>Earthquake Royal Commission – California's Safety Assessment Program</title><description>The Royal Commission has made available a copy of the California Emergency Management Agency&amp;rsquo;s&amp;nbsp;&amp;nbsp;It can be downloaded from&amp;nbsp;.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/avonside-chch-earthquake-royal-commission-californias-safety-assessment-program'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/avonside-chch-earthquake-royal-commission-californias-safety-assessment-program</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Wed, 28 Nov 2012 20:57:00 GMT</pubDate></item><item><title>Earthquake Royal Commission – more evidence relating to the CTV building has been published</title><description>The Royal Commission has published more of the evidence provided for the hearings on the CTV building.&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/avonside-chch-earthquake-royal-commission-more-evidence-relating-to-the-ctv-building-has-been-published'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/avonside-chch-earthquake-royal-commission-more-evidence-relating-to-the-ctv-building-has-been-published</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Fri, 23 Nov 2012 01:30:00 GMT</pubDate></item><item><title>Technical Reports - Peer Review - Canterbury Earthquake Sequence and Implications for Seismic Design Levels</title><description>The Commission received the following advice from Professor Ralph Archuleta of the University of California, Santa Barbara. The paper reviews&amp;nbsp;the technical report&amp;nbsp;by GNS Science.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-reports-peer-review-canterbury-earthquake-sequence-and-implications-for-seismic-design-levels'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-reports-peer-review-canterbury-earthquake-sequence-and-implications-for-seismic-design-levels</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Wed, 21 Nov 2012 10:03:05 GMT</pubDate></item><item><title>Technical Reports - Base Isolation and Damage-Resistant Technologies for Improved Seismic Performance of Buildings</title><description>The Commission sought the advice of Professor Andrew Buchanan, Holcim Adjunct Professor Des Bull, Associate Professor Rajesh Dhakal, Associate Professor Greg MacRae, Dr Alessandro Palermo and Associate Professor Stefano Pampanin&amp;nbsp;from the University of Canterbury on new technologies to improve seismic performance of buildings.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-reports-base-isolation-and-damage-resistant-technologies-for-improved-seismic-performance-of-buildings'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-reports-base-isolation-and-damage-resistant-technologies-for-improved-seismic-performance-of-buildings</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Wed, 21 Nov 2012 09:54:15 GMT</pubDate></item><item><title>Technical Report - Stairs and Access Ramps Between Floors in Multi-storey Buildings</title><description>This report, which was written by Des Bull of Holmes Consulting Group, indicates that in&amp;nbsp;light of the damage sustained to stairs and access ramps in the Christchurch earthquakes a review was needed into the way these items are designed.&amp;nbsp; It is clear that inadequate allowance has been made in the past for the relative movement that occurs between floors in a major earthquake.&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-stairs-and-access-ramps-between-floors-in-multi-storey-buildings'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-stairs-and-access-ramps-between-floors-in-multi-storey-buildings</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Wed, 21 Nov 2012 09:48:10 GMT</pubDate></item><item><title>Technical Report - Structural Design For Earthquake Resistance Past, Present and Future</title><description>The Commission&amp;nbsp;received a report written by Associate Professor Rajesh Dhakal of the University of Canterbury. The report, which was offered to the Commission, provided an indepth discussion of the way in which the current approach to seismic design has developed, and how this may change in the future.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-structural-design-for-earthquake-resistance-past-present-and-future'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-structural-design-for-earthquake-resistance-past-present-and-future</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Wed, 21 Nov 2012 09:46:59 GMT</pubDate></item><item><title>Technical Report - Preliminary Observations from Christchurch Earthquakes</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-preliminary-observations-from-christchurch-earthquakes'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-preliminary-observations-from-christchurch-earthquakes</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Mon, 19 Nov 2012 15:53:00 GMT</pubDate></item><item><title>Technical Report - Peer Review - The Performance of Unreinforced Masonry Buildings in the 2010-2011 Canterbury Earthquake Swarm</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-peer-review-the-performance-of-unreinforced-masonry-buildings-in-the-2010-2011-canterbury-earthquake-swarm'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/canterbury-royal-comission-technical-report-peer-review-the-performance-of-unreinforced-masonry-buildings-in-the-2010-2011-canterbury-earthquake-swarm</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Mon, 19 Nov 2012 15:51:45 GMT</pubDate></item><item><title>CTV inquest: Chaotic scenes at Air force base caused delays</title><description>Chaotic scenes on the tarmac of a Royal New Zealand Air Force base meant critical search and rescue experts and specialist equipment were delayed arriving in Christchurch after the February 22 earthquake, an inquest heard today.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-chaotic-scenes-at-air-force-base-caused-delays'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-chaotic-scenes-at-air-force-base-caused-delays</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Fri, 09 Nov 2012 18:10:46 GMT</pubDate></item><item><title>CTV inquest: Bomb rescue techniques used</title><description>A search and rescue expert used Oklahoma City bombing terrorist attack rescue techniques to take control of the CTV Building collapse site, an inquest heard today.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-bomb-rescue-techniques-used'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-bomb-rescue-techniques-used</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Fri, 09 Nov 2012 11:00:42 GMT</pubDate></item><item><title>CTV rescuers refused to take a break</title><description>Christchurch rescue crews urged to take a break from the earthquake response told bosses: &amp;quot;Get stuffed, this is our city&amp;quot;.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-press-news-ctv-rescuers-refused-to-take-a-break'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-press-news-ctv-rescuers-refused-to-take-a-break</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Thu, 08 Nov 2012 11:51:15 GMT</pubDate></item><item><title>CTV inquest: Rescue gear did not arrive until day after collapse</title><description>Specialist search and rescue gear did not arrive at the CTV Building collapse site until the day after it came down, killing 115 people, an inquest was told today.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-rescue-gear-did-not-arrive-until-day-after-collapse'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-rescue-gear-did-not-arrive-until-day-after-collapse</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Wed, 07 Nov 2012 15:16:53 GMT</pubDate></item><item><title>Using diggers at CTV 'unacceptable'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-press-news-using-diggers-at-ctv-unacceptable'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-press-news-using-diggers-at-ctv-unacceptable</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Wed, 07 Nov 2012 11:43:21 GMT</pubDate></item><item><title>CTV inquest: 'Smoke was pouring out of gaps'</title><description>Firefighter Manu Clarkson told the CTV inquest today he was inside a narrow void in the collapsed building when aftershocks struck and he was yelled at to get out.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-smoke-was-pouring-out-of-gaps'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-nz-herald-ctv-inquest-smoke-was-pouring-out-of-gaps</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Tue, 06 Nov 2012 15:22:51 GMT</pubDate></item><item><title>Fire Service not prepared for quakes - officer</title><description>An inquest into the CTV building collapse following the February quake has heard the Fire Service wasn&amp;#39;t prepared for the building collapse&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/3news-co-nz-fire-service-not-prepared-for-quakes-officer'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/3news-co-nz-fire-service-not-prepared-for-quakes-officer</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Tue, 06 Nov 2012 11:15:00 GMT</pubDate></item><item><title>Fire Service not prepared for CTV disaster</title><description>The Fire Service was not prepared to deal with an emergency like the Canterbury Television (CTV) collapse and little has changed since, an inquest has heard.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/the-press-news-fire-service-not-prepared-for-ctv-disaster'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/the-press-news-fire-service-not-prepared-for-ctv-disaster</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 06 Nov 2012 09:57:00 GMT</pubDate></item><item><title>After Christchurch quake, tough calls for USAR at CTV site</title><description>The head of USAR denies he faced political pressure to resume searching the CTV building a day after the quake.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/3news-co-nz-after-christchurch-quake-tough-calls-for-usar-at-ctv-site'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/3news-co-nz-after-christchurch-quake-tough-calls-for-usar-at-ctv-site</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 05 Nov 2012 19:00:00 GMT</pubDate></item><item><title>Officer defends moving USAR teams off CTV site</title><description>A USAR officer at the CTV collapse has defended his decision to send search and rescue teams elsewhere.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/11/3news-co-nz-officer-defends-moving-usar-teams-off-ctv-site'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/11/3news-co-nz-officer-defends-moving-usar-teams-off-ctv-site</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 05 Nov 2012 13:11:00 GMT</pubDate></item><item><title>Inquest hears texts from trapped CTV victims</title><description>Four students trapped in Christchurch&amp;#39;s collapsed CTV building after the 2011 February earthquake tried to contact family and friends before they died, an inquest has heard.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-inquest-hears-texts-from-trapped-ctv-victims'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-inquest-hears-texts-from-trapped-ctv-victims</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 31 Oct 2012 12:54:00 GMT</pubDate></item><item><title>Officer blames USAR for CTV delays</title><description>A senior police officer&amp;#39;s taken a shot at Urban Search and Rescue&amp;#39;s approach at the devastated CTV building in Christchurch.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-officer-blames-usar-for-ctv-delays'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-officer-blames-usar-for-ctv-delays</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Tue, 30 Oct 2012 18:25:00 GMT</pubDate></item><item><title>CTV rescue efforts 'hampered' by USAR</title><description>Police faced a &amp;quot;damned if you do, damned if you don&amp;#39;t&amp;quot; situation when trying to save survivors of the Canterbury Television (CTV) building collapse, an inquiry has heard.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/the-press-news-ctv-rescue-efforts-hampered-by-usar'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/the-press-news-ctv-rescue-efforts-hampered-by-usar</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 30 Oct 2012 11:05:14 GMT</pubDate></item><item><title>CTV inquest expects more harrowing testimony</title><description>More harrowing testimony is expected as a coroner&amp;#39;s inquest into the deaths of eight CTV Building victims continues today.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/the-nz-herald-ctv-inquest-expects-more-harrowing-testimony'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/the-nz-herald-ctv-inquest-expects-more-harrowing-testimony</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Tue, 30 Oct 2012 08:15:03 GMT</pubDate></item><item><title>CTV rescue stats questioned</title><description>The number of foreigners known to be alive but not rescued in the CTV building has risen from six to eight.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-ctv-rescue-stats-questioned'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-ctv-rescue-stats-questioned</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 29 Oct 2012 17:21:00 GMT</pubDate></item><item><title>Dramatic footage shown at CTV inquiry</title><description>An inquest in Christchurch has been shown dramatic footage from last year&amp;#39;s February quake showing rescues and some bodies recovered.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-dramatic-footage-shown-at-ctv-inquiry'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-dramatic-footage-shown-at-ctv-inquiry</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 29 Oct 2012 11:46:00 GMT</pubDate></item><item><title>CTV coroner's inquest resumes</title><description>A coroner&amp;#39;s probe into the deaths of six people who survived but could not be rescued from the CTV Building collapse in last year&amp;#39;s killer February earthquake has resumed in Christchurch.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/the-nz-herald-ctv-coroners-inquest-resumes'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/the-nz-herald-ctv-coroners-inquest-resumes</link><author>website@rebuildchristchurch.co.nz (MediaHerald)</author><pubDate>Mon, 29 Oct 2012 09:34:40 GMT</pubDate></item><item><title>CTV coronial inquest restarts 13 months on</title><description>More than a year after it was adjourned, a coroner will resume the hearings into the deaths of people in the CTV building.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-ctv-coronial-inquest-restarts-13-months-on'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-ctv-coronial-inquest-restarts-13-months-on</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Mon, 29 Oct 2012 05:21:00 GMT</pubDate></item><item><title>Earthquake Royal Commission – eight more technical reports on representative city buildings</title><description>&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/avonside-chch-earthquake-royal-commission-eight-more-technical-reports-on-representative-city-buildings'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/avonside-chch-earthquake-royal-commission-eight-more-technical-reports-on-representative-city-buildings</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Sat, 27 Oct 2012 09:30:00 GMT</pubDate></item><item><title>Earthquake Royal Commission – technical reports on representative city buildings</title><description>From the Royal Commission&amp;rsquo;s website:&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/avonside-chch-earthquake-royal-commission-technical-reports-on-representative-city-buildings'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/avonside-chch-earthquake-royal-commission-technical-reports-on-representative-city-buildings</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Fri, 26 Oct 2012 12:00:00 GMT</pubDate></item><item><title>Canterbury earthquakes Royal Commission extended final reporting date announced</title><description>Christopher Finlayson | Attorney-General&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/beehive-canterbury-earthquakes-royal-commission-extended-final-reporting-date-announced'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/beehive-canterbury-earthquakes-royal-commission-extended-final-reporting-date-announced</link><author>website@rebuildchristchurch.co.nz (GovtBeehive)</author><pubDate>Tue, 23 Oct 2012 16:33:00 GMT</pubDate></item><item><title>Second quake report handed to Govt</title><description>The second part of a royal commission&amp;#39;s report on the Canterbury Earthquakes is being considered by the Government.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-second-quake-report-handed-to-govt'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/3news-co-nz-second-quake-report-handed-to-govt</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 10 Oct 2012 12:38:00 GMT</pubDate></item><item><title>Aussie cops to investigate CTV builder</title><description>Police in Australia will investigate claims the man who supervised the construction of the CTV building stole another man&amp;#39;s identity.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/10/stuff-co-nz-aussie-cops-to-investigate-ctv-builder'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/10/stuff-co-nz-aussie-cops-to-investigate-ctv-builder</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Sat, 06 Oct 2012 09:48:00 GMT</pubDate></item><item><title>158 buildings may share CTV flaw</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-158-buildings-may-share-ctv-flaw'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-158-buildings-may-share-ctv-flaw</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Fri, 21 Sep 2012 14:45:00 GMT</pubDate></item><item><title>Royal Commission reconfirms CTV hearing complete</title><description>The Canterbury Earthquakes Royal Commission&amp;rsquo;s terms of reference requires it to inquire into the performance of buildings in the Canterbury earthquakes including why the CTV building failed.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/royal-commission-reconfirms-ctv-hearing-complete'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/royal-commission-reconfirms-ctv-hearing-complete</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Tue, 18 Sep 2012 08:53:41 GMT</pubDate></item><item><title>Pressure on commission to revisit role of Shirtcliff</title><description>Pressure is building on the Canterbury Earthquakes Royal Commission to have a closer look at a Christchurch fraudster who appears to have misled the commission.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-pressure-on-commission-to-revisit-role-of-shirtcliff'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-pressure-on-commission-to-revisit-role-of-shirtcliff</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 18 Sep 2012 05:00:00 GMT</pubDate></item><item><title>Commission confirms CTV hearing complete</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-commission-confirms-ctv-hearing-complete'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-commission-confirms-ctv-hearing-complete</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Sun, 16 Sep 2012 12:07:00 GMT</pubDate></item><item><title>Families call for perjury charges against Shirtcliff</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-families-call-for-perjury-charges-against-shirtcliff'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-families-call-for-perjury-charges-against-shirtcliff</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Sun, 16 Sep 2012 07:47:00 GMT</pubDate></item><item><title>Press newspaper’s expose of CTV builder’s fraudulent qualifications</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-press-newspaper-s-expose-of-ctv-builder-s-fraudulent-qualifications'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-press-newspaper-s-expose-of-ctv-builder-s-fraudulent-qualifications</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Sat, 15 Sep 2012 18:50:00 GMT</pubDate></item><item><title>A life of lies</title><description>His $200,000, 13 metre motor cruiser Vagabond bobs on the sunny water of beautiful Manly Boat Harbour, Brisbane.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-a-life-of-lies'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-a-life-of-lies</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Fri, 14 Sep 2012 23:18:27 GMT</pubDate></item><item><title>Earthquake Royal Commission – transcript of the Roles and Responsibilities hearing held on 11 September 2012</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-earthquake-royal-commission-transcript-of-the-roles-and-responsibilities-hearing-held-on-11-september-2012'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-earthquake-royal-commission-transcript-of-the-roles-and-responsibilities-hearing-held-on-11-september-2012</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Fri, 14 Sep 2012 22:13:00 GMT</pubDate></item><item><title>Engineer: failed building techniques still used in Chch</title><description>&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-engineer-failed-building-techniques-still-used-in-chch'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-engineer-failed-building-techniques-still-used-in-chch</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Tue, 11 Sep 2012 18:14:00 GMT</pubDate></item><item><title>Earthquake Royal Commission – CTV enquiry: closing submissions on behalf of bereaved families and those injured</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-earthquake-royal-commission-ctv-enquiry-closing-submissions-on-behalf-of-bereaved-families-and-those-injured'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-earthquake-royal-commission-ctv-enquiry-closing-submissions-on-behalf-of-bereaved-families-and-those-injured</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Fri, 07 Sep 2012 20:52:00 GMT</pubDate></item><item><title>Tearful end to CTV inquiry</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-tearful-end-to-ctv-inquiry'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-tearful-end-to-ctv-inquiry</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Fri, 07 Sep 2012 18:33:00 GMT</pubDate></item><item><title>CTV hearings expected to wrap up</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-ctv-hearings-expected-to-wrap-up'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-ctv-hearings-expected-to-wrap-up</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Fri, 07 Sep 2012 06:38:00 GMT</pubDate></item><item><title>CTV engineers defended at commission</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-ctv-engineers-defended-at-commission'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-ctv-engineers-defended-at-commission</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Thu, 06 Sep 2012 16:53:00 GMT</pubDate></item><item><title>Multiple parties aware of CTV's weakness</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-multiple-parties-aware-of-ctvs-weakness'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-multiple-parties-aware-of-ctvs-weakness</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Thu, 06 Sep 2012 11:38:40 GMT</pubDate></item><item><title>Earthquake Royal Commission–CTV enquiry, closing submissions</title><description>The Royal Commission has published the closing submissions of counsel assisting the Royal Commission. A copy can be downloaded from&amp;nbsp;.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-earthquake-royal-commission-ctv-enquiry-closing-submissions'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/avonside-chch-earthquake-royal-commission-ctv-enquiry-closing-submissions</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Thu, 06 Sep 2012 06:51:00 GMT</pubDate></item><item><title>Post-quake checks gave 'false sense of security'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-post-quake-checks-gave-false-sense-of-security'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-post-quake-checks-gave-false-sense-of-security</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Wed, 05 Sep 2012 23:14:00 GMT</pubDate></item><item><title>Designers blamed for CTV building collapse</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-designers-blamed-for-ctv-building-collapse'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/3news-co-nz-designers-blamed-for-ctv-building-collapse</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 05 Sep 2012 12:07:00 GMT</pubDate></item><item><title>CTV witnesses' lawyers to wrap up hearing</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-ctv-witnesses-lawyers-to-wrap-up-hearing'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-ctv-witnesses-lawyers-to-wrap-up-hearing</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Wed, 05 Sep 2012 09:20:59 GMT</pubDate></item><item><title>Call for disaster volunteers to be paid</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/call-for-disaster-volunteers-to-be-paid'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/call-for-disaster-volunteers-to-be-paid</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 04 Sep 2012 11:12:25 GMT</pubDate></item><item><title>Quake expert praises CBD cordon</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-quake-expert-praises-cbd-cordon'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-quake-expert-praises-cbd-cordon</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 03 Sep 2012 16:11:29 GMT</pubDate></item><item><title>Placard system 'confusing' after quakes</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-placard-system-confusing-after-quakes'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/9/stuff-co-nz-placard-system-confusing-after-quakes</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 03 Sep 2012 12:30:00 GMT</pubDate></item><item><title>Quakes commission seeks 70 changes</title><description>The Government has accepted all 70 recommendations of the Canterbury Earthquakes Royal Commission on technical engineering issues.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-quakes-commission-seeks-70-changes'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-quakes-commission-seeks-70-changes</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Thu, 23 Aug 2012 15:19:00 GMT</pubDate></item><item><title>CTV building should never have gone up, says husband</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-building-should-never-have-gone-up-says-husband'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-building-should-never-have-gone-up-says-husband</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Sun, 19 Aug 2012 07:31:21 GMT</pubDate></item><item><title>Faults in CTV building known</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-faults-in-ctv-building-known'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-faults-in-ctv-building-known</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Thu, 16 Aug 2012 22:35:00 GMT</pubDate></item><item><title>Earthquake Royal Commission–Engineering training and education and the organisation of the profession.</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/avonside-chch-earthquake-royal-commission-engineering-training-and-education-and-the-organisation-of-the-profession-'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/avonside-chch-earthquake-royal-commission-engineering-training-and-education-and-the-organisation-of-the-profession-</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Thu, 16 Aug 2012 20:50:00 GMT</pubDate></item><item><title>Coroner to resume CTV inquiry</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-coroner-to-resume-ctv-inquiry'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-coroner-to-resume-ctv-inquiry</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Thu, 16 Aug 2012 12:46:00 GMT</pubDate></item><item><title>CTV deaths inquest to start again</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-deaths-inquest-to-start-again'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-deaths-inquest-to-start-again</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Thu, 16 Aug 2012 12:00:42 GMT</pubDate></item><item><title>CTV engineer 'was experienced'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-engineer-was-experienced'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-engineer-was-experienced</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Wed, 15 Aug 2012 13:57:10 GMT</pubDate></item><item><title>CTV code compliance suggestions 'opportunistic'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-code-compliance-suggestions-opportunistic'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-code-compliance-suggestions-opportunistic</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 14 Aug 2012 12:49:00 GMT</pubDate></item><item><title>CTV needed a critical eye - engineer</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-needed-a-critical-eye---engineer'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-needed-a-critical-eye---engineer</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 13 Aug 2012 15:10:00 GMT</pubDate></item><item><title>Faults in the CTV building 'difficult to find'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-faults-in-the-ctv-building-difficult-to-find'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-faults-in-the-ctv-building-difficult-to-find</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 13 Aug 2012 11:24:41 GMT</pubDate></item><item><title>Code compliance focus of CTV inquiry</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-code-compliance-focus-of-ctv-inquiry'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-code-compliance-focus-of-ctv-inquiry</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 13 Aug 2012 10:12:06 GMT</pubDate></item><item><title>CTV columns did not comply with code</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-columns-did-not-comply-with-code'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-columns-did-not-comply-with-code</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Thu, 09 Aug 2012 14:34:00 GMT</pubDate></item><item><title>My role was limited - Shirtcliff</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-my-role-was-limited---shirtcliff'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-my-role-was-limited---shirtcliff</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Wed, 08 Aug 2012 23:23:00 GMT</pubDate></item><item><title>CTV construction manager a 'fraudster'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-ctv-construction-manager-a-fraudster'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-ctv-construction-manager-a-fraudster</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 08 Aug 2012 18:27:00 GMT</pubDate></item><item><title>Money issues slowed CTV construction</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-money-issues-slowed-ctv-construction'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-money-issues-slowed-ctv-construction</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Wed, 08 Aug 2012 11:26:00 GMT</pubDate></item><item><title>Families question CTV collapse apology</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-families-question-ctv-collapse-apology'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-families-question-ctv-collapse-apology</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Wed, 08 Aug 2012 07:00:00 GMT</pubDate></item><item><title>Earthquake Royal Commission – Opening Submission for Christchurch City Council</title><description>&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/avonside-chch-earthquake-royal-commission---opening-submission-for-christchurch-city-council'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/avonside-chch-earthquake-royal-commission---opening-submission-for-christchurch-city-council</link><author>website@rebuildchristchurch.co.nz (avonsidechch)</author><pubDate>Tue, 07 Aug 2012 18:55:00 GMT</pubDate></item><item><title>Design boss apologises to bereaved</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-design-boss-apologises-to-bereaved'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/3news-co-nz-design-boss-apologises-to-bereaved</link><author>website@rebuildchristchurch.co.nz (Media3News)</author><pubDate>Tue, 07 Aug 2012 16:33:00 GMT</pubDate></item><item><title>CTV designer apologises to bereaved families</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-designer-apologises-to-bereaved-families'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-designer-apologises-to-bereaved-families</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 07 Aug 2012 15:04:03 GMT</pubDate></item><item><title>CTV building permit in spotlight</title><description>&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-building-permit-in-spotlight'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-building-permit-in-spotlight</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Tue, 07 Aug 2012 07:26:55 GMT</pubDate></item><item><title>Media release - Technical reports being prepared</title><description>&lt;p&gt;The Canterbury Earthquakes Royal Commission has commissioned a raft of reports from New Zealand and international technical experts to help its inquiry into building failure caused by the Canterbury earthquakes.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-media-release---technical-reports-being-prepared'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-media-release---technical-reports-being-prepared</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Mon, 06 Aug 2012 14:32:20 GMT</pubDate></item><item><title>Media release - Technical reports being prepared</title><description>&lt;p&gt;The Canterbury Earthquakes Royal Commission has commissioned a raft of reports from New Zealand and international technical experts to help its inquiry into building failure caused by the Canterbury earthquakes.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-media-release-technical-reports-being-prepared'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-media-release-technical-reports-being-prepared</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Mon, 06 Aug 2012 14:32:17 GMT</pubDate></item><item><title>Technical Reports - Department of Building and Housing</title><description>The require the Commission to receive and take into account the results of a technical investigation conducted by the Department of Building and Housing (DBH) into the failure of the CTV, PGC, Forsyth Barr and Hotel Grand Chancellor buildings.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-technical-reports-department-of-building-and-housing'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-technical-reports-department-of-building-and-housing</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Mon, 06 Aug 2012 13:43:14 GMT</pubDate></item><item><title>Technical Reports - Heritage Earthquake Prone Building Strengthening Cost Study</title><description>This report was prepared by Christchurch City Council&amp;nbsp;in 2009. It contains information about the cost of strengthening earthquake-prone buildings and was prepared by John Hare of Holmes Consulting Group.&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-technical-reports-heritage-earthquake-prone-building-strengthening-cost-study'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/canterbury-royal-comission-technical-reports-heritage-earthquake-prone-building-strengthening-cost-study</link><author>website@rebuildchristchurch.co.nz (RoyalCommission)</author><pubDate>Mon, 06 Aug 2012 13:39:45 GMT</pubDate></item><item><title>CTV draughtsman 'has no memory'</title><description>&amp;nbsp;&lt;p&gt;&lt;a href='http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-draughtsman-has-no-memory'&gt;Read more...&lt;/a&gt;&lt;/p&gt;</description><link>http://www.rebuildchristchurch.co.nz/blog/2012/8/stuff-co-nz-ctv-draughtsman-has-no-memory</link><author>website@rebuildchristchurch.co.nz (MediaStuff)</author><pubDate>Mon, 06 Aug 2012 08:00:00 GMT</pubDate></item></channel></rss>