Reporting requirements

Our terms of reference require us to report to the Governor-General Rt Hon Sir Anand Satyanand on:

(a) any measures necessary or desirable to prevent or minimise the failure of buildings in New Zealand due to earthquakes likely to occur during the lifetime of those buildings; and

(b) the cost of those measures; and

(c) the adequacy of legal and best-practice requirements for building design, construction, and maintenance insofar as those requirements apply to managing risks of building failure caused by earthquakes:

Two reports are required. By 11 October 2011 we are required to deliver an interim report with interim recommendations. This document will inform early decision-making on rebuilding and repair work that forms parts of the recovery from the Canterbury earthquakes.

The final report will be delivered by 11 April 2012.

Discussion

Related Items

Community to have say on red zone’s future

Community to have say on red zone’s future

Thursday, 17 April 2014 9:23 a.m. by GovtBeehive

Rebuild Jobs

Show me more jobs like these

Powered by