Technical Report - Stairs and Access Ramps Between Floors in Multi-storey Buildings

Posted 21 Nov 2012 by RoyalCommission Popular

Stairs and Access Ramps between Floors in Multi-storey Buildings

This report, which was written by Des Bull of Holmes Consulting Group, indicates that in light of the damage sustained to stairs and access ramps in the Christchurch earthquakes a review was needed into the way these items are designed.  It is clear that inadequate allowance has been made in the past for the relative movement that occurs between floors in a major earthquake. 

The report noted that in both previous and current design standards the displacements that stairs must sustain in a major earthquake are under-estimated.  A method of determining the required design displacements for stairs in new buildings is outlined and an approach for assessing the required displacements for retrofit of existing stairs on the basis of existing design calculations is given.   

 Stairs and Access Ramps Between Floors in Multi-storey Buildings (.PDF) 138 kb

This article was sourced from another website - view the original article.

Discussion

Related Items

Changes proposed to bring life to the Square

Changes proposed to bring life to the Square

Monday, 31 July 2017 12:25 p.m. by Regenerate Featured Popular
Southern Response to Step in on EQC Botched Repairs

Southern Response to Step in on EQC Botched Repairs

Monday, 26 June 2017 7:22 p.m. by Labour Featured Popular
Canterbury wellbeing data shows positive trends

Canterbury wellbeing data shows positive trends

Friday, 16 June 2017 11:52 a.m. by GovtBeehive Popular