EQC has engaged Fletcher EQR (Earthquake Recovery) to manage the repair of homes with damage between $10,000 and $100,000 (+GST) per event.
This includes some homes that have total damage over $100,000 (+GST) but sustained damage in multiple quakes. If that damage is below $100,000 for each event, the claim will be referred to the Canterbury Home Repair Programme.
You will not incur extra costs if the repair works exceed the EQC estimate.
All liabilities around the repairs will be covered by EQR, with any defects in the quality of the repair work put right by the EQR team at no cost to you.
Fletcher EQR will have full responsibility for managing all facets of your project including:
If you have a preferred contractor you may still be included in the scheme and retain all the scheme's protections, provided your contractor is accredited with Fletchers. Your contractor can apply for accreditation by emailing contractor<at>eqr.co.nz. For further information visit Fletcher's website: http://www.eqr.co.nz/
Yes. If you do opt out you are responsible for:
To opt out contact EQC on 0800 DAMAGE (0800 326 243) and request an opt out form and supporting information.
Obtain necessary building consent and ensure all repairs comply with the Building Act.
Progress payments can be made on completed work only, not in advance, and must be correctly invoiced for GST. All invoices must be either:
It is important to ensure the invoice is prepared in your name.
EQC will pay the contractor directly on your behalf. As part of EQC’s audit processes, an EQC estimator may need to sight the repairs before any payment is made.
When the repairs are completed, and before the final payment is made, you will need to obtain either:
Any disputes regarding non-performance of the contractor or substandard repair work are the responsibility of the property owner.
What to do if you find further damage
If you discover further damage during the repair process, you must notify EQC immediately and stop all work until the additional damage has been inspected and authorised by EQC and the cost agreed.
EQC excess payable by you
The excess for EQC claims for damage to contents and/or dwelling is 1% of the claim value, subject to a minimum excess of $200.
EQC will deduct the applicable excess from the first payment made to your contractor if the excess has not already been deducted in full from your contents claim. You are responsible for paying the excess on your repairs.
For more information see Consumer Build's website (a partnership between Department of Building & Housing, and Consumer).