Snow issues

Posted 06 Jun 2012 by GovtCera Popular
Posted in CERA/Govt
This item was posted on the Cera website - click here to view the original

The Avondale Earthquake Assistance Centre (EAC), based at the Avondale golf course, is closed today.

The building is accessed by a long sloping ramp which is proving too hazardous to walk on in the snow.

It will reopen tomorrow (Thursday 7 June).

The CBD Red Zone remains open and operational today, however some contractors may assess their own work programmes if the heavy snow continues.  

Discussion

Related Items

Students design 130 metre mural for East Frame

Students design 130 metre mural for East Frame

Wednesday, 21 December 2016 1:05 p.m. by GOVTOtakaroltd Popular
Worcester East Terrace and Worcester Bridge punt stop complete.

Worcester East Terrace and Worcester Bridge punt stop complete.

Wednesday, 21 December 2016 12:59 p.m. by GOVTOtakaroltd Featured Popular
Work on East Frame Residential Development to begin early 2017

Work on East Frame Residential Development to begin early 2017

Tuesday, 20 December 2016 8:56 p.m. by GOVTOtakaroltd Featured Popular