Gayhurst Road – Dallington – Wastewater manholes

Works Begin 02 Apr 2012 Works End 18 Apr 2012
Works Status Pending Completion

We are undertaking construction works at two manholes along Gayhurst Road from Monday 2 April 2012 for approximately 3 weeks.

Aerial photo showing the location of manholes on Gayhurst Road

  • Stage 2: Intersection of Gayhurst Road and Coopers Road

    The red circle indicates the area of construction.

    Work to commence on Tuesday 10 April 2012 and is expected to be completed by Wednesday 18 April 2012.

    Traffic on Gayhurst Road will continue to flow in both directions but a temporary traffic lights system will be in place during the work.

  • Stage1: Intersection of Gayhurst Road and Strathfield Avenue

    The blue circle indicates the area of construction.

    Work commences on Monday 2 April 2012 and is expected to be completed by Thursday 5 April 2012.

    On Gayhurst Road (between Coopers Road and McBratneys Road) one way traffic will be maintained towards the roundabout at McBratneys Road.

Aerial Photography © Terralink International Limited

The inside walls of both the manhole excavation areas will be secured with sheetpiles. This installation will cause some vibrations and noise.

Vehicle access for residents will be restricted during the day for the duration of the works. We will confirm the dates by leaving a form in your letterbox prior to the work starting, to ensure the residents have a chance to move their vehicles out of their driveways.

Please contact us if you have any specific access requirements that we need to consider e.g. Nurse Maude, Meals on Wheels or other planned works on your property.

This work will take place from 7am to 6pm Monday to Friday; it may include some Saturday work if necessary.

The work will result in some noise and vibration, as well as dust if there are dry weather conditions. All works are subject to favorable weather and on-site conditions.

The work will not impact current power, sewer, water or gas services.

During the period of construction, we ask that you observe special cordons around construction areas for you and your family's safety.

For any further information about this work, please contact the MacDow Fletcher Infrastructure Rebuild Team between the hours of 8:30am and 5pm Monday to Friday on free phone 0508 718 719. Any emergency calls made outside these hours will be diverted to a Site Engineer.

We will endeavor to keep any disruption to a minimum. We apologise for any inconvenience and appreciate your patience while we do this work.

Worknotice Status: 
Active
Start date: 
Mon, 02/04/2012
End date: 
Wed, 18/04/2012