Works Begin 18 Apr 2012 Works End 20 Apr 2012
Works Status Pending Completion

We are replacing the manhole lid at 27 Dallington Terrace from Wednesday 18 April 2012 for approximately 2 days.

Aerial photo showing the location of work

The yellow line indicates the area of construction outside 27 Dallington Terrace.

Aerial Photography © Terralink International Limited

  • This work will take place from 7am to 6pm Monday to Friday; it may include some Saturday work if necessary and is expected to be completed by Friday 20 April 2012.
  • There will be a one lane closure with a priority give way in place along Dallington Terrace during the construction works.
  • Access to driveways may be affected but residents will be notified in advance.
  • Please contact us if you have any specific access requirements that we need to consider e.g. Nurse Maude, Meals on Wheels or other planned works on your property.
  • There will be a footpath closure on the river bank side during the construction period.
  • The work will not impact current power, telecommunication, sewer, water or gas services.
  • The work may result in noise, vibration and dust if there are dry weather conditions. All works are subject to favourable weather and on-site conditions.
  • During the period of construction, we ask that you observe special cordons around construction areas for you and your family's safety.
  • For any further information about this work, please contact the MacDow Fletcher Infrastructure Rebuild Team between the hours of 8:30am and 5pm Monday to Friday on free phone 0508 718 719. Any emergency calls made outside these hours will be diverted to a Site Engineer.
  • We will endeavour to keep any disruption to a minimum. We apologise for any inconvenience and appreciate your patience while we do this work.
Worknotice Status: 
Active
Start date: 
Wed, 18/04/2012